
Higher Education
UCLA Mo Ostin Basketball Center
Los Angeles, CA
A marquee athletics facility with specialty finishes on a campus that does not tolerate schedule slip.
Selected Projects
Schools that opened on time. Hospitals that stayed open during construction. Terminals built around live operations. The point is never the size of the project. It is how the customer was treated and how the problem was solved.





















































































Healthcare / OSHPD
Baldwin Park, CA
A large, complex, award-winning ground-up medical center campus. At the time, the largest single contract in McCarthy Building Companies' history.
Read the case study
Higher Education
Los Angeles, CA
A marquee athletics facility with specialty finishes on a campus that does not tolerate schedule slip.

Commercial
Los Angeles, CA
Exterior systems and finish work on a landmark Hollywood community campus.

Higher Education
Norwalk, CA
Campus construction phased around an active academic calendar.

Higher Education
San Bernardino, CA
Large-volume interior work with long spans and exposed structure.

Higher Education
Los Angeles, CA
Delivered with Bernards on a public community college district program.

K-12
Irvine, CA
A new K-8 campus with exterior plaster and cladding systems across multiple buildings.

Hospitality
Dana Point, CA
Complete renovation of a five-star luxury waterfront hotel that remained open and operational throughout.
Read the case study
Higher Education
Riverside, CA
A multi-building city block for the district, including a performing arts theater with over 1,000 sheets of drywall on the ceiling forming custom chevron acoustical deflectors.

K-12
San Bernardino, CA
A neighborhood elementary campus rebuilt for the district.

Civic
San Bernardino, CA
Terminal interiors, ticketing, and gate areas delivered as a complete finish package.

Civic
San Bernardino, CA
Gate interiors detailed for heavy public traffic and long service life.

K-12
Southern California
Caston self-performed the Thermory wood siding, plus air barriers, drywall, plaster, scaffolding, and metal framing.
Read the case study
K-12
Southern California
A ten-scope, multi-discipline package delivered with tight logistics and high-end finishes, turned over for the first day of term.
Read the case study
K-12
Irvine, CA
Multi-discipline scope on a large campus, completed on a compressed schedule.
Read the case study
K-12
Southern California
Fifteen scopes under one contract, consolidating what would normally be eight subcontractors into one accountable partner for Balfour Beatty.
Read the case study
Healthcare / OSHPD
Colton, CA
Sole wall and ceiling contractor on a 1.1 million square foot replacement medical center campus.
Read the case study
Healthcare / OSHPD
Loma Linda, CA
Cancer center construction for Loma Linda University Medical Center.

Higher Education
Los Angeles, CA
Design-build framing and five more scopes, built during the COVID-19 pandemic without losing a day on the schedule.
Read the case study
Higher Education
San Bernardino, CA
Student union construction at California State University, San Bernardino.

Higher Education
Cypress, CA
Ultra-high-performance concrete panels engineered under design-build deferred approval, finished to match the existing campus panels.
Read the case study
Higher Education
Claremont, CA
Eleven scopes including GFRG and glass fiber concrete panels, all provided by Caston.
Read the case study
Commercial
Southern California
Restaurant construction by Caston's self-performing crews.

Commercial
Southern California
GFRC pieces and a faux concrete plaster assembly blending seamlessly with adjacent cast-in-place concrete.
Read the case study
Commercial
Manhattan Beach, CA
Retail construction for Macy's at Manhattan Beach.

Commercial
Beverly Hills, CA
High-end finishes for Christie's West Coast flagship, an adaptive reuse project in Beverly Hills.
Read the case study
Civic
Orange County, CA
A large civic project delivered through a public-private partnership (P3).
Read the case study
Civic
Southern California
Metal panels, lath and plaster, and fiber cement panels all provided by Caston, with exterior finishes sourced from three continents.
Read the case study
Civic
Ontario, CA
An extremely tight schedule, finished early, with design-build framing and a themed bat wall.
Read the case study
Interiors · Historic Renovations
Southern California
Caston as general contractor, self-performing seven scopes across five phases while the office stayed fully operational.
Read the case study
Interiors
Southern California
Interior construction for Tarsus Pharmaceuticals.

Interiors
Southern California
Interior construction for Liberty Utilities.

Hospitality
Anaheim, CA
Custom hand-carved faux-wood plaster in the middle of an active Downtown Disney.
Read the case study
Hospitality
Manhattan Beach, CA
Hotel construction in Manhattan Beach.

Hospitality
Indian Wells, CA
Golf resort construction in Indian Wells.

Historic Renovations
Redlands, CA
Historic renovation of a landmark public library.

Historic Renovations
Southern California
Historic gymnasium renovation.

Historic Renovations
Redlands, CA
Adaptive reuse of a historic newspaper office, with acoustical plaster gallery ceilings and custom EIFS shapes.
Read the case study
Higher Education
Lancaster, CA
Self-performed metal panels and CMU carried under Caston, in addition to framing, drywall, and plaster.
Read the case study
Higher Education
Indio, CA
Plaster, fiber cement panels, and TAKTL ultra high performance concrete panels, including a freestanding canopy with an intricate foam and plaster ceiling pattern.

K-12
Costa Mesa, CA
TAKTL ultra high performance panels in multiple colors, textures, and patterns, alongside all of Caston's core self-performed scopes.

Historic Renovations
Pasadena, CA
Historic renovation work at an iconic Southern California venue.
Your Project Here
The next one on this page could be yours.
Bring us the scope others have hesitated on. We will tell you how we would build it.
What Partners Say
“The Stonegate Elementary Project has been deemed a huge success by both C.W. Driver and the Irvine Unified School District. These accolades are due in large part to Caston's excellence on the job. Your office and field stood out as one of the best Contractors. Period.”
“Caston has done a great job on this project, not only the scope of work was performed with no injuries but ahead of time. The building looks amazing. Kudos to you all.”
“Your team always performs and exceeds expectations. Dave and I never worry when we have Caston on our projects. Thank you for being a valued partner with Erickson-Hall.”
Have a project others have hesitated on?
Talk to Caston